Customer
Requirement
Furniture including: headboard, bed frame, nightstands, Writing Table and Chair, TV stand, lounge chair and coffee table, sofa and center table, wardrobe, luggage rack.
There are 368 rooms with 5 different designs.
Solutions
Based on many years of work experience, we provide customer with some effective suggestions. We tried our best to search for materials that match the specifications with the best prices.
Our designer went to the hotel to take measurements, so as to reduce the size error of the furniture.
The installation problem was solved by sending workers to the site for installation.
Project Time Line
- Aug. 2009: Received the inquiry.
- Aug. 2009: The hotel owner visited our factory and discussed the details.
- Sept. 2009: Made samples.
- Oct. 2009: The samples were sent to Shanghai. Our workers installed the mock room.
- Dec. 2009: Made a deal and confirmed the details.
- Fab. 2009: Mass production.
- May 2010: Delivered the goods to the hotel.
- May 2010: Our workers were sent to the hotel to install the furniture.
- June 2010: Hotel opened.