Customer
Requirement
Furniture including: headboard, bed frame, nightstands, Writing Table and Chair, TV stand, TV frame, decorative Cabinet, wardrobe, luggage rack, Wall panel, cladding.
Star standard: five star;
Material requirement:
Veneer: walnut wood veneer;
Solid wood: natural solid teak wood;
Solid wood: solid teak wood;
Hardware: HAFELE brand;
Solutions
Based on many years of work experience, we provide customer with some effective suggestions. We tried our best to search for materials that match the specifications with the best prices.
Our designer went to the hotel to take measurements, so as to reduce the size error of the furniture.
The installation problem was solved by sending workers to the site for installation.
Project Time Line
- March 2017: Received the inquiry.
- April 2017: The hotel owner visited our factory and discussed the details.
- April 2017: Made samples.
- May 2018: The hotel owner came to our factory again to check the quality of samples.
- June 2018: Made a deal and confirmed the details.
- July 2018: Mass production
- Oct. 2018: Delivered the goods to the hotel.
- Oct. 2018: Our workers were sent to the hotel to install the furniture.
- Nov. 2018: Hotel opened.